


From flat steel processing into a complete pre-engineered building and pipe manufacturing enterprise, built on trust.
Founded with PFS (Process Flat Steel), HR coil and checker coil processing.
CTL, precise coil cutting, steel structure preparation and pre-fabricated steel building.
Industrial building plan drafted; execution began within two months.
Launched 1st January 2025 — MS & GI pipe manufacturing at Unit 1.